6,837
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MS0466 #06 Y:2026 | 06 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $19,101 | $93,000 |
n/a
|
| MS0466 #05 Y:2026 | 05 | 2026 | Replace hydraulic / pneumatic equipment with electric equipment | $42,861 | $712 |
n/a
|
| MS0466 #04 Y:2026 | 04 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,210 | $2,244 |
n/a
|
| MS0466 #03 Y:2026 | 03 | 2026 | Combine utility meters | $300 | - |
n/a
|
| MS0466 #02 Y:2026 | 02 | 2026 | Change rate schedules or other changes in utility service | $44,517 | - |
n/a
|
| MS0466 #01 Y:2026 | 01 | 2026 | Optimize plant power factor | $41,807 | $88,391 |
n/a
|
| UD1129 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,317 | $953 |
n/a
|
| UD1129 #02 Y:2026 | 02 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $239 | - |
n/a
|
| UD1129 #01 Y:2026 | 01 | 2026 | Turn off equipment during breaks, reduce operating time | $16,412 | - |
n/a
|
| WV0697 #11 Y:2026 | 11 | 2026 | Utilize energy-efficient belts and other improved mechanisms | $786 | $1,442 |
n/a
|
| WV0697 #10 Y:2026 | 10 | 2026 | Reduce the pressure of compressed air to the minimum required | $1,041 | $450 |
n/a
|
| WV0697 #09 Y:2026 | 09 | 2026 | Upgrade controls on compressors | $1,453 | $2,015 |
n/a
|
| WV0697 #08 Y:2026 | 08 | 2026 | Develop a repair/replace policy | $1,821 | $4,975 |
n/a
|
| WV0697 #07 Y:2026 | 07 | 2026 | Install occupancy sensors | $2,152 | $1,620 |
n/a
|
| WV0697 #06 Y:2026 | 06 | 2026 | Install set-back timers | $2,519 | $1,225 |
n/a
|
| WV0697 #05 Y:2026 | 05 | 2026 | Analyze flue gas for proper air/fuel ratio | $3,285 | $1,296 |
n/a
|
| WV0697 #04 Y:2026 | 04 | 2026 | Establish a predictive maintenance program | $2,950 | $3,300 |
n/a
|
| WV0697 #03 Y:2026 | 03 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $3,389 | $625 |
n/a
|
| WV0697 #02 Y:2026 | 02 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $9,066 | $22,250 |
n/a
|
| WV0697 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $17,550 | $21,788 |
n/a
|