*See Full Grant Solicitation for full qualification and selection details.

6,847

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0467 #04 Y:2026 Optimize plant power factor $18,243 $121,000
MS0467 #03 Y:2026 Reduce the pressure of compressed air to the minimum required $10,936 -
MS0467 #02 Y:2026 Install vinyl strip / high speed / air curtain doors $5,879 $1,680
MS0467 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $8,030 $2,244
MS0466 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $19,101 $93,000
MS0466 #05 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $42,861 $712
MS0466 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,210 $2,244
MS0466 #03 Y:2026 Combine utility meters $300 -
MS0466 #02 Y:2026 Change rate schedules or other changes in utility service $44,517 -
MS0466 #01 Y:2026 Optimize plant power factor $41,807 $88,391
LS2605 #06 Y:2026 Replace fossil fuel equipment with electrical equipment $78,865 $433,647
LS2605 #05 Y:2026 Upgrade controls on compressors $2,498 $12,500
LS2605 #04 Y:2026 Install sub-metering equipment $6,258 $5,250
LS2605 #03 Y:2026 Clean and maintain refrigerant condensers and towers $1,247 $490
LS2605 #02 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $365 $45
LS2605 #01 Y:2026 Reduce the pressure of compressed air to the minimum required $1,280 $25
UD1129 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,317 $953
UD1129 #02 Y:2026 Utilize energy-efficient belts and other improved mechanisms $239 -
UD1129 #01 Y:2026 Turn off equipment during breaks, reduce operating time $16,412 -
WV0697 #11 Y:2026 Utilize energy-efficient belts and other improved mechanisms $786 $1,442