Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,869

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Machinery manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UF0645 #09 Y:2026 Improve space comfort conditioning $28,846 $31,213
UF0645 #08 Y:2026 Replace existing equipment with more suitable substitutes $28,500 $1,912
UF0645 #07 Y:2026 Install timers on light switches in little used areas $820 $315
UF0645 #06 Y:2026 Use waste heat from hot flue gases to preheat $1,294 $1,610
UF0645 #05 Y:2026 Reduce the pressure of compressed air to the minimum required $1,638 -
UF0645 #04 Y:2026 Minimize condenser cooling water temperature $4,516 $6,528
UF0645 #03 Y:2026 Install timers on light switches in little used areas $4,803 $20,000
UF0645 #02 Y:2026 Utilize controls to operate equipment only when needed $10,771 $25,570
UF0645 #01 Y:2026 Use demand controller or load shedder $15,284 $12,285
MU0087 #13 Y:2026 Close holes and openings in building such as broken windows $311 $91
MU0087 #12 Y:2026 Lower temperature during the winter season and vice-versa $160 -
MU0087 #11 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,384 $248
MU0087 #10 Y:2026 Utilize higher efficiency lamps and/or ballasts $49 $176
MU0087 #09 Y:2026 Use photocell controls $237 $360
MU0087 #08 Y:2026 Make a practice of turning off lights when not needed $35 $84
MU0087 #07 Y:2026 Turn off equipment when not in use $3,495 -
MU0087 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $896 -
MU0087 #05 Y:2026 Use or replace with energy efficient substitutes $75 $650
MU0087 #04 Y:2026 Optimize plant power factor $5,236 $38,117
MU0087 #03 Y:2026 Recharge batteries on during off-peak demand periods $253 $345