Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

301

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Industrial valve manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS2502 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $9,614 $6,975
LS2502 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $889 $45
LS2502 #03 Y:2024 Install occupancy sensors $6,194 $300
LS2502 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $2,742 $100
LS2502 #01 Y:2024 Clean and maintain refrigerant condensers and towers $7,922 -
SU0554 #09 Y:2024 Use heat pump for space conditioning $12,437 $105,375
SU0554 #08 Y:2024 Replace fossil fuel equipment with electrical equipment $82,048 $526,750
SU0554 #07 Y:2024 Utilize higher efficiency lamps and/or ballasts $355 $466
SU0554 #06 Y:2024 Use or replace with energy efficient substitutes $1,419 $54
SU0554 #05 Y:2024 Apply for tax-free status for energy purchases $5,553 $84
SU0554 #04 Y:2024 Disconnect ballasts $25 -
SU0554 #03 Y:2024 Recharge batteries on during off-peak demand periods $124 -
SU0554 #02 Y:2024 Pay bills on time to avoid late fees $1,907 -
SU0554 #01 Y:2024 Reschedule plant operations or reduce load to avoid peaks $19,596 -
UA0284 #06 Y:2024 Utilize energy-efficient belts and other improved mechanisms $310 $88
UA0284 #05 Y:2024 Reduce the pressure of compressed air to the minimum required $479 $500
UA0284 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,762 $8,114
UA0284 #03 Y:2024 Use waste heat from hot flue gases to preheat $2,801 $783
UA0284 #02 Y:2024 Install timers and/or thermostats $6,430 $1,437
UA0284 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $8,690 $13,427