ITAC Assessment: SU0554
ITAC logo
ITAC Assessment: SU0554
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Valves and Hydrants
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $100
M
to 500
M
# of Employees 321
Plant Area 466,000
ft2
Annual Production 171,808
units
Production Hrs. Annual 4,420
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,798,077 37,089,137
kWh
Electricity Demand $391,909 174,614
kW-mo/yr
Electricity Fees $26,699 -
Natural Gas $684,614 124,471
MMBtu
LPG $94,423 2,636
MMBtu
Fuel Oil #1 $2,530 85
MMBtu
Other Gas $39,010 1
MMBtu
TOTAL YEARLY COSTS $3,037,262
RECOMMENDED SAVINGS* $123,465 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Fuel Oil #1 Savings Personnel Changes Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $19,596 - - $19,596
-
kW-mo/yr
- - - - -
02 4.821: Pay bills on time to avoid late fees $1,907 - - - - - - - $1,907
03 2.3132: Recharge batteries on during off-peak demand periods $124 - - $124
-
kW-mo/yr
- - - - -
04 2.7122: Disconnect ballasts $25 - $20
421
kWh
$5
-
kW-mo/yr
- - - - -
05 2.8121: Apply for tax-free status for energy purchases $5,553 $84 - - - - - - $5,553
06 2.4322: Use or replace with energy efficient substitutes $1,419 $54 $1,845
38,250
kWh
$471
-
kW-mo/yr
$(-897.3)
-
MMBtu
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $355 $466 $282
5,869
kWh
$18
-
kW-mo/yr
- - - $55 -
08 2.1321: Replace fossil fuel equipment with electrical equipment $82,048 $526,750 $(-14,904.3)
(-310,505)
kWh
- - $94,423
-
MMBtu
$2,530
-
MMBtu
- -
09 2.7234: Use heat pump for space conditioning $12,437 $105,375 $(-8,033.5)
(-167,365)
kWh
- $20,471
-
MMBtu
- - - -
TOTAL RECOMMENDED $123,465 $632,729 $(-20,790.2)
(-433,330)
kWh
$20,214
-
kW-mo/yr
$19,574
-
MMBtu
$94,423
-
MMBtu
$2,530
-
MMBtu
$55 $7,460
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Fuel Oil #1 Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs