Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

786

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metal coating, engraving (except jewelry and silverware), and allied services to manufacturers
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0263 #03 Y:2024 Use proper thickness of insulation on building envelope $1,365 $1,730
UU0263 #02 Y:2024 Improve air circulation with destratification fans / other methods $7,105 $5,100
UU0263 #01 Y:2024 Install common header on compressors $7,583 $46,630
SJ0028 #05 Y:2024 Lower temperature during the winter season and vice-versa $2,098 -
SJ0028 #04 Y:2024 Utilize energy-efficient belts and other improved mechanisms $69 $62
SJ0028 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $1,344 $2,064
SJ0028 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $6,130 -
SJ0028 #01 Y:2024 Use adjustable frequency drive or multiple speed motors on existing system $2,778 $9,383
NL0102 #07 Y:2024 Utilize energy-efficient belts and other improved mechanisms $882 $802
NL0102 #06 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,130 $1,000
NL0102 #05 Y:2024 Install sub-metering equipment $1,237 $1,850
NL0102 #04 Y:2024 Improve air circulation with destratification fans / other methods $5,253 $10,118
NL0102 #03 Y:2024 Apply for tax-free status for energy purchases $10,283 $250
NL0102 #02 Y:2024 Close holes and openings in building such as broken windows $21,171 $6,200
NL0102 #01 Y:2024 Upgrade obsolete equipment $88,713 $315,000
MZ0358 #07 Y:2024 Use waste heat from hot flue gases to preheat incoming fluids $4,887 $14,220
MZ0358 #06 Y:2024 Analyze flue gas for proper air/fuel ratio $8,666 $2,000
MZ0358 #05 Y:2024 Utilize energy-efficient belts and other improved mechanisms $1,179 $320
MZ0358 #04 Y:2024 Lower temperature during the winter season and vice-versa $1,826 $1,760
MZ0358 #03 Y:2024 Install occupancy sensors $1,050 $2,050