ITAC Assessment: MZ0358
ITAC logo
ITAC Assessment: MZ0358
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product coated aluminum and steel sheet
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 151,505
ft2
Annual Production 51,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $532,557 6,816,819
kWh
Electricity Demand $46,160 16,101
kW-mo/yr
Natural Gas $1,281,847 202,615
MMBtu
Waste Disposal Costs
Water Usage $64,796 27,900
Tgal
TOTAL YEARLY COSTS $1,925,360
RECOMMENDED SAVINGS* $28,265 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $9,335 $1,200 $8,875
113,785
kWh
$460
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,322 $200 $1,258
16,131
kWh
$64
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,050 $2,050 $1,050
13,471
kWh
- -
04 2.7221: Lower temperature during the winter season and vice-versa $1,826 $1,760 $1,826
23,420
kWh
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,179 $320 $1,122
14,381
kWh
$57
-
kW-mo/yr
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $8,666 $2,000 - - $8,666
-
MMBtu
07 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $4,887 $14,220 - - $4,887
-
MMBtu
TOTAL RECOMMENDED $28,265 $21,750 $14,131
181,188
kWh
$581
-
kW-mo/yr
$13,553
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings