ITAC Assessment: SJ0028
ITAC logo
ITAC Assessment: SJ0028
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal powder coat
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 40,200
ft2
Annual Production 125,000,000
units
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,414 454,033
kWh
Electricity Demand $23,121 2,983
kW-mo/yr
Natural Gas $219,492 17,111
MMBtu
TOTAL YEARLY COSTS $290,027
RECOMMENDED SAVINGS* $12,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,778 $9,383 $2,205
21,207
kWh
$573
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,130 - $6,130
58,940
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,344 $2,064 $1,127
10,834
kWh
$217
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $69 $62 $69
661
kWh
- -
05 2.7221: Lower temperature during the winter season and vice-versa $2,098 - $23
219
kWh
- $2,075
-
MMBtu
TOTAL RECOMMENDED $12,419 $11,509 $9,554
91,861
kWh
$790
-
kW-mo/yr
$2,075
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs