ITAC Assessment: MAS014
ITAC logo
ITAC Assessment: MAS014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Soup
NAICS 311991: Perishable Prepared Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 70,000
ft2
Annual Production 32,500,000
lb
Production Hrs. Annual 5,590
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $354,145 3,656,592
kWh
Electricity Demand $200,568 9,230
kW-mo/yr
Electricity Fees $45,492 -
Natural Gas $368,022 34,596
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2611: Moderate cooling tower outlet temperature $47,869 $10,650 $32,310
333,781
kWh
$15,559
-
kW-mo/yr
-
02 2.4131: Size electric motors for peak operating efficiency $15,371 $17,325 $9,548
98,646
kWh
$5,823
-
kW-mo/yr
-
03 2.2136: Install / repair insulation on steam lines $4,256 $8,190 - - $4,256
-
MMBtu
04 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,288 $2,070 $1,600
16,524
kWh
$688
-
kW-mo/yr
-
05 2.2694: Use highest temperature for chilling or cold storage $2,033 $200 $1,425
14,722
kWh
$608
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $496 $700 $496
5,132
kWh
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $493 $200 $493
5,090
kWh
- -
TOTAL RECOMMENDED $72,806 $39,335 $45,872
473,895
kWh
$22,678
-
kW-mo/yr
$4,256
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs