ITAC Assessment: AR0185
ITAC logo
ITAC Assessment: AR0185
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Steel Pipe Coupling
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 175,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 5,616
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,822 5,592,907
kWh
Electricity Demand $157,918 15,689
kW-mo/yr
Natural Gas $41,359 8,169
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $516,484 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,005

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings By-product Production Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,559 $260 $1,534
53,048
kWh
$1,025
-
kW-mo/yr
- - - -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,930 - - $6,930
-
kW-mo/yr
- - - -
03 2.2221: Use immersion heating in tanks, melting pots, etc $16,446 $15,663 $2,419
83,529
kWh
$9,663
-
kW-mo/yr
- $4,364 - -
04 2.4221: Install compressor air intakes in coolest locations $768 $300 $419
14,361
kWh
$349
-
kW-mo/yr
- - - -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,764 - - - $3,764
-
lb
- - -
06 4.514: Re-arrange equipment layout to reduce handling costs $21,267 $59,881 - - - - $21,267 -
07 4.652: Replace existing equipment with more suitable substitutes $464,750 $385,000 - - - - - $464,750
TOTAL RECOMMENDED $516,484 $461,104 $4,372
150,938
kWh
$17,967
-
kW-mo/yr
$3,764
-
lb
$4,364 $21,267 $464,750
TOTAL IMPLEMENTED $19,005 $15,923 $3,953
136,577
kWh
$10,688
-
kW-mo/yr
- $4,364 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs