ITAC Assessment: UU0263
ITAC logo
ITAC Assessment: UU0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Surface Finishing
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 59,000
ft2
Annual Production 1,343
thousand feet
Production Hrs. Annual 4,832
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,420 658,320
kWh
Electricity Demand $47,093 2,914
kW-mo/yr
Electricity Fees $11,287 -
Natural Gas $79,768 7,072
MMBtu
Fuel Oil #2 $71,966 2,692
MMBtu
Other Gas $6,118 1
MMBtu
TOTAL YEARLY COSTS $239,652
RECOMMENDED SAVINGS* $79,661 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.4225: Install common header on compressors $7,583 $46,630 $630
17,510
kWh
$617
-
kW-mo/yr
- $6,336
-
MMBtu
-
02 2.7243: Improve air circulation with destratification fans / other methods $7,105 $5,100 - - $7,105
-
MMBtu
- -
03 2.7492: Use proper thickness of insulation on building envelope $1,365 $1,730 - - $1,365
-
MMBtu
- -
04 2.2414: Use waste heat from hot flue gases to preheat $1,805 $8,150 - - $1,805
-
MMBtu
- -
05 2.1131: Repair faulty insulation in furnaces, boilers, etc $3,948 $2,110 - - $3,948
-
MMBtu
- -
06 2.8113: Purchase gas directly from a contract gas supplier $4,840 $11,200 - - - - $4,840
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,270 $7,380 $5,270
148,090
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $945 $3,580 $591
16,600
kWh
$354
-
kW-mo/yr
- - -
09 2.3212: Optimize plant power factor $3,940 $9,000 - - - - $3,940
10 2.8123: Pay utility bills on time $1,860 $1,500 - - - - $1,860
11 2.8121: Apply for tax-free status for energy purchases $8,090 $5,000 - - - - $8,090
12 2.1321: Replace fossil fuel equipment with electrical equipment $32,910 $158,576 $(-14,310.0)
(-402,100)
kWh
$(-41,510.0)
-
kW-mo/yr
- $50,330
-
MMBtu
$38,400
TOTAL RECOMMENDED $79,661 $259,956 $(-7,819.4)
(-219,900)
kWh
$(-40,539.1)
-
kW-mo/yr
$14,223
-
MMBtu
$56,666
-
MMBtu
$57,130
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs