| Assessment Year | 2025 |
|---|---|
| Principal Product | Surface Finishing |
| NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
| SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
59,000
ft2
|
| Annual Production | 1,343
thousand feet
|
| Production Hrs. Annual | 4,832
hrs
|
| Location (State) | Utah |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $23,420 | 658,320 |
kWh
|
$0.036 |
| Electricity Demand | $47,093 | 2,914 |
kW-mo/yr
|
$16.16 |
| Electricity Fees | $11,287 | - |
|
- |
| Natural Gas | $79,768 | 7,072 |
MMBtu
|
$11.28 |
| Fuel Oil #2 | $71,966 | 2,692 |
MMBtu
|
$26.74 |
| Other Gas | $6,118 | 1 |
MMBtu
|
$6,117.52 |
| TOTAL YEARLY COSTS | $239,652 | |||
| RECOMMENDED SAVINGS* | $79,661 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $79,661 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4225: Install common header on compressors | $7,583 | $46,630 |
$630
17,510
kWh
|
$617
-
kW-mo/yr
|
- |
$6,336
-
MMBtu
|
- | |
| 02 | 2.7243: Improve air circulation with destratification fans / other methods | $7,105 | $5,100 | - | - |
$7,105
-
MMBtu
|
- | - | |
| 03 | 2.7492: Use proper thickness of insulation on building envelope | $1,365 | $1,730 | - | - |
$1,365
-
MMBtu
|
- | - | |
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $1,805 | $8,150 | - | - |
$1,805
-
MMBtu
|
- | - | |
| 05 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $3,948 | $2,110 | - | - |
$3,948
-
MMBtu
|
- | - | |
| 06 | 2.8113: Purchase gas directly from a contract gas supplier | $4,840 | $11,200 | - | - | - | - | $4,840 | |
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,270 | $7,380 |
$5,270
148,090
kWh
|
- | - | - | - | |
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $945 | $3,580 |
$591
16,600
kWh
|
$354
-
kW-mo/yr
|
- | - | - | |
| 09 | 2.3212: Optimize plant power factor | $3,940 | $9,000 | - | - | - | - | $3,940 | |
| 10 | 2.8123: Pay utility bills on time | $1,860 | $1,500 | - | - | - | - | $1,860 | |
| 11 | 2.8121: Apply for tax-free status for energy purchases | $8,090 | $5,000 | - | - | - | - | $8,090 | |
| 12 | 2.1321: Replace fossil fuel equipment with electrical equipment | $32,910 | $158,576 |
$(-14,310.0)
(-402,100)
kWh
|
$(-41,510.0)
-
kW-mo/yr
|
- |
$50,330
-
MMBtu
|
$38,400 | |
| TOTAL RECOMMENDED | $79,661 | $259,956 |
$(-7,819.4)
(-219,900)
kWh
|
$(-40,539.1)
-
kW-mo/yr
|
$14,223
-
MMBtu
|
$56,666
-
MMBtu
|
$57,130 | ||
| TOTAL IMPLEMENTED | $79,661 | $259,956 |
$(-7,819.4)
(-219,900)
kWh
|
$(-40,539.1)
-
kW-mo/yr
|
$14,223
-
MMBtu
|
$56,666
-
MMBtu
|
$57,130 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs