ITAC Assessment: AM0336
ITAC logo
ITAC Assessment: AM0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Coops for transportation of live poultry
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 10,345
pieces
Production Hrs. Annual 2,517
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,686 992,966
kWh
Electricity Demand $40,288 4,970
kW-mo/yr
Natural Gas $48,097 12,853
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,330

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $84,980 $80,500 - - $(-41,330.0) - $126,310
02 2.7124: Make a practice of turning off lights when not needed $3,750 - $3,750
75,029
kWh
- - - -
03 2.8121: Apply for tax-free status for energy purchases $640 $800 - - - $640 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $600 $100 $600
12,016
kWh
- - - -
05 2.7124: Make a practice of turning off lights when not needed $460 - $200
4,103
kWh
$260
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $290 $14 $130
2,638
kWh
$160
-
kW-mo/yr
- - -
07 2.6212: Turn off equipment during breaks, reduce operating time $135 - $135
1,758
kWh
- - - -
TOTAL RECOMMENDED $90,855 $81,414 $4,815
95,544
kWh
$420
-
kW-mo/yr
$(-41,330.0) $640 $126,310
TOTAL IMPLEMENTED $89,330 $80,600 $4,350
87,045
kWh
- $(-41,330.0) - $126,310
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs