387
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Metal heat treating | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SD0525 #03 Y:2015 | 03 | 2015 | Utilize higher efficiency lamps and/or ballasts | $3,617 | $7,417 | |
| SD0525 #02 Y:2015 | 02 | 2015 | Use waste heat from hot flue gases to preheat | $10,754 | $16,450 | |
| SD0525 #01 Y:2015 | 01 | 2015 | Reschedule plant operations or reduce load to avoid peaks | $11,264 | $750 | |
| BS0053 #06 Y:2015 | 06 | 2015 | Utilize higher efficiency lamps and/or ballasts | $220 | $600 | |
| BS0053 #05 Y:2015 | 05 | 2015 | Utilize higher efficiency lamps and/or ballasts | $660 | $3,120 | |
| BS0053 #04 Y:2015 | 04 | 2015 | Cover open tanks | $44 | $50 | |
| BS0053 #03 Y:2015 | 03 | 2015 | Insulate bare equipment | $826 | $968 | |
| BS0053 #02 Y:2015 | 02 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $879 | $910 | |
| BS0053 #01 Y:2015 | 01 | 2015 | Reduce the pressure of compressed air to the minimum required | $1,692 | $15 | |
| OR0646 #05 Y:2015 | 05 | 2015 | Isolate hot or cold equipment | $44,385 | $3,000 | |
| OR0646 #04 Y:2015 | 04 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $23,468 | $24,468 | |
| OR0646 #03 Y:2015 | 03 | 2015 | Modify process to reduce material use/cost | $20,000 | $1,000 | |
| OR0646 #02 Y:2015 | 02 | 2015 | Improve combustion control capability | $42,592 | $25,071 | |
| OR0646 #01 Y:2015 | 01 | 2015 | Improve combustion control capability | $80,430 | $5,071 | |
| LE0389 #06 Y:2014 | 06 | 2014 | Use waste heat from hot flue gases to preheat | $4,484 | $20,000 | |
| LE0389 #05 Y:2014 | 05 | 2014 | Utilize higher efficiency lamps and/or ballasts | $19,458 | $81,373 | |
| LE0389 #04 Y:2014 | 04 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $642 | $1,000 | |
| LE0389 #03 Y:2014 | 03 | 2014 | Replace city water with recycled water via cooling tower | $21,418 | $21,650 | |
| LE0389 #02 Y:2014 | 02 | 2014 | Analyze flue gas for proper air/fuel ratio | $8,547 | $4,500 | |
| LE0389 #01 Y:2014 | 01 | 2014 | Use / purchase optimum sized compressor | $1,935 | $450 |