Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

387

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Metal heat treating
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0525 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $3,617 $7,417
SD0525 #02 Y:2015 Use waste heat from hot flue gases to preheat $10,754 $16,450
SD0525 #01 Y:2015 Reschedule plant operations or reduce load to avoid peaks $11,264 $750
BS0053 #06 Y:2015 Utilize higher efficiency lamps and/or ballasts $220 $600
BS0053 #05 Y:2015 Utilize higher efficiency lamps and/or ballasts $660 $3,120
BS0053 #04 Y:2015 Cover open tanks $44 $50
BS0053 #03 Y:2015 Insulate bare equipment $826 $968
BS0053 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $879 $910
BS0053 #01 Y:2015 Reduce the pressure of compressed air to the minimum required $1,692 $15
OR0646 #05 Y:2015 Isolate hot or cold equipment $44,385 $3,000
OR0646 #04 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $23,468 $24,468
OR0646 #03 Y:2015 Modify process to reduce material use/cost $20,000 $1,000
OR0646 #02 Y:2015 Improve combustion control capability $42,592 $25,071
OR0646 #01 Y:2015 Improve combustion control capability $80,430 $5,071
LE0389 #06 Y:2014 Use waste heat from hot flue gases to preheat $4,484 $20,000
LE0389 #05 Y:2014 Utilize higher efficiency lamps and/or ballasts $19,458 $81,373
LE0389 #04 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $642 $1,000
LE0389 #03 Y:2014 Replace city water with recycled water via cooling tower $21,418 $21,650
LE0389 #02 Y:2014 Analyze flue gas for proper air/fuel ratio $8,547 $4,500
LE0389 #01 Y:2014 Use / purchase optimum sized compressor $1,935 $450