Assessment Year | 2015 |
---|---|
Principal Product | Commercial Heat Treat Services |
NAICS | 332811: Metal Heat Treating |
SIC | 3398: Metal Heat Treating |
Sales Range | $5 M to 10M |
# of Employees | 43 |
Plant Area |
80,000
ft2
|
Annual Production | 1,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,758 | 1,753,850 |
kWh
|
$0.072 |
Electricity Demand | $12,674 | 3,570 |
kW-mo/yr
|
$3.55 |
Electricity Fees | $5,508 | - |
|
- |
Natural Gas | $323,634 | 61,637 |
MMBtu
|
$5.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $56,484 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $52,000 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4226: Use / purchase optimum sized compressor | $1,935 | $450 |
$1,725
23,958
kWh
|
$210
-
kW-mo/yr
|
- | - | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $8,547 | $4,500 | - | - |
$8,547
-
MMBtu
|
- | - | |
03 | 3.4114: Replace city water with recycled water via cooling tower | $21,418 | $21,650 | - | - | - |
$21,418
-
gal
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $642 | $1,000 |
$601
8,348
kWh
|
$41
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,458 | $81,373 |
$16,211
225,153
kWh
|
$1,097
-
kW-mo/yr
|
- | - | $2,150 | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $4,484 | $20,000 | - | - |
$4,484
-
MMBtu
|
- | - | |
TOTAL RECOMMENDED | $56,484 | $128,973 |
$18,537
257,459
kWh
|
$1,348
-
kW-mo/yr
|
$13,031
-
MMBtu
|
$21,418
-
gal
|
$2,150 | ||
TOTAL IMPLEMENTED | $52,000 | $108,973 |
$18,537
257,459
kWh
|
$1,348
-
kW-mo/yr
|
$8,547
-
MMBtu
|
$21,418
-
gal
|
$2,150 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs