Assessment Year 1999
Principal Product Metal Stampings
NAICS
n/a
SIC 3460:
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 89,000
ft2
Annual Production 100,000,000
pieces
Production Hrs. Annual 4,598
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,451 2,129,836
kWh
Electricity Demand $52,491 5,592
kW-mo/yr
Electricity Fees $4,402 -
Natural Gas $8,854 2,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,685 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,996

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 2.7111: Reduce illumination to minimum necessary levels $533 $542 $533
17,878
kWh
- - -
02 2.4221: Install compressor air intakes in coolest locations $1,156 $1,000 $676
19,343
kWh
$480
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,404 $1,425 $2,570
73,271
kWh
$1,834
-
kW-mo/yr
- -
04 3.3122: Use filtration, centrifuging to remove contaminants $5,903 $11,000 - - $5,903
-
gal
-
05 4.621: Use fixtures to reduce machine changeout times $13,689 $960 - - - $13,689
TOTAL RECOMMENDED $25,685 $14,927 $3,779
110,492
kWh
$2,314
-
kW-mo/yr
$5,903
-
gal
$13,689
TOTAL IMPLEMENTED $11,996 $13,967 $3,779
110,492
kWh
$2,314
-
kW-mo/yr
$5,903
-
gal
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs