Assessment Year | 1999 |
---|---|
Principal Product | Metal Stampings |
NAICS |
n/a
|
SIC | 3460: |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
89,000
ft2
|
Annual Production | 100,000,000
pieces
|
Production Hrs. Annual | 4,598
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,451 | 2,129,836 |
kWh
|
$0.035 |
Electricity Demand | $52,491 | 5,592 |
kW-mo/yr
|
$9.39 |
Electricity Fees | $4,402 | - |
|
- |
Natural Gas | $8,854 | 2,229 |
MMBtu
|
$3.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $25,685 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,996 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $533 | $542 |
$533
17,878
kWh
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,156 | $1,000 |
$676
19,343
kWh
|
$480
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,404 | $1,425 |
$2,570
73,271
kWh
|
$1,834
-
kW-mo/yr
|
- | - | |
04 | 3.3122: Use filtration, centrifuging to remove contaminants | $5,903 | $11,000 | - | - |
$5,903
-
gal
|
- | |
05 | 4.621: Use fixtures to reduce machine changeout times | $13,689 | $960 | - | - | - | $13,689 | |
TOTAL RECOMMENDED | $25,685 | $14,927 |
$3,779
110,492
kWh
|
$2,314
-
kW-mo/yr
|
$5,903
-
gal
|
$13,689 | ||
TOTAL IMPLEMENTED | $11,996 | $13,967 |
$3,779
110,492
kWh
|
$2,314
-
kW-mo/yr
|
$5,903
-
gal
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs