ITAC Assessment: OR0646
ITAC logo
ITAC Assessment: OR0646
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Commercial heat treatment
NAICS 332811: Metal Heat Treating
SIC 3398: Metal Heat Treating
Sales Range $100
M
to 500
M
# of Employees 50
Plant Area 53,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $232,675 3,518,320
kWh
Electricity Demand $33,623 11,756
kW-mo/yr
Electricity Fees $56,824 -
Natural Gas $308,050 47,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $210,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $148,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.1116: Improve combustion control capability $80,430 $5,071 - - $80,430
-
MMBtu
-
02 2.1116: Improve combustion control capability $42,592 $25,071 - - $42,592
-
MMBtu
-
03 4.131: Modify process to reduce material use/cost $20,000 $1,000 - - - $20,000
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $23,468 $24,468 $20,885
333,120
kWh
$2,583
-
kW-mo/yr
- -
05 2.2522: Isolate hot or cold equipment $44,385 $3,000 - - $44,385
-
MMBtu
-
TOTAL RECOMMENDED $210,875 $58,610 $20,885
333,120
kWh
$2,583
-
kW-mo/yr
$167,407
-
MMBtu
$20,000
TOTAL IMPLEMENTED $148,283 $32,539 $20,885
333,120
kWh
$2,583
-
kW-mo/yr
$124,815
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs