| Assessment Year | 2016 |
|---|---|
| Principal Product | Marketing Media |
| NAICS | 323111: Commercial Printing (except Screen and Books) |
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 90 |
| Plant Area |
75,000
ft2
|
| Annual Production | 12,000,000
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Florida |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $85,838 | 1,840,800 |
kWh
|
$0.047 | |
| Electricity Demand | $78,195 | 6,569 |
kW-mo/yr
|
$11.90 | |
| Electricity Fees | $30,340 | - |
|
- | |
| Waste Disposal Costs | |||||
| Water Usage | $7,059 | 870,500 |
Tgal
|
$0.008 | |
| Other Liquid (non-haz) | $8,170 | 143,000 |
gal
|
$0.057 | |
| TOTAL YEARLY COSTS | $209,603 | ||||
| RECOMMENDED SAVINGS* | $36,566 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $27,185 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,192 | $28,975 |
$4,156
88,417
kWh
|
$3,036
-
kW-mo/yr
|
- | |
| 02 | 3.4151: Minimize water usage | $6,896 | $7,439 | - | - |
$6,896
-
Tgal
|
|
| 03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $6,338 | $4,536 |
$4,702
100,046
kWh
|
$1,636
-
kW-mo/yr
|
- | |
| 04 | 2.7111: Reduce illumination to minimum necessary levels | $5,274 | $760 |
$3,048
64,841
kWh
|
$2,226
-
kW-mo/yr
|
- | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $2,502 | $40 |
$1,856
39,495
kWh
|
$646
-
kW-mo/yr
|
- | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,425 | $10,408 |
$1,800
38,289
kWh
|
$625
-
kW-mo/yr
|
- | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $1,786 | $639 |
$1,032
21,962
kWh
|
$754
-
kW-mo/yr
|
- | |
| 08 | 2.7135: Install occupancy sensors | $1,217 | $1,149 |
$1,217
25,892
kWh
|
- | - | |
| 09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,001 | $3,585 |
$1,001
21,294
kWh
|
- | - | |
| 10 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $879 | $1,660 |
$508
10,808
kWh
|
$371
-
kW-mo/yr
|
- | |
| 11 | 2.4226: Use / purchase optimum sized compressor | $541 | $420 |
$312
6,651
kWh
|
$229
-
kW-mo/yr
|
- | |
| 12 | 2.6127: Maintain air filters by cleaning or replacement | $325 | $173 |
$188
3,989
kWh
|
$137
-
kW-mo/yr
|
- | |
| 13 | 2.4239: Eliminate or reduce compressed air usage | $190 | $80 |
$107
2,272
kWh
|
$83
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $36,566 | $59,864 |
$19,927
423,956
kWh
|
$9,743
-
kW-mo/yr
|
$6,896
-
Tgal
|
||
| TOTAL IMPLEMENTED | $27,185 | $54,868 |
$13,057
277,764
kWh
|
$7,233
-
kW-mo/yr
|
$6,896
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs