| Assessment Year | 2016 |
|---|---|
| Principal Product | Treated Wastewater, Recycled Water |
| NAICS | 562211: Hazardous Waste Treatment and Disposal |
| SIC | 4953: Refuse Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 75 |
| Plant Area |
1,600,000
ft2
|
| Annual Production | 4,380,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $384,745 | 3,702,913 |
kWh
|
$0.10 |
| Electricity Demand | $364,805 | 18,058 |
kW-mo/yr
|
$20.20 |
| Natural Gas | $77,129 | 23,874 |
MMBtu
|
$3.23 |
| TOTAL YEARLY COSTS | $826,679 | |||
| RECOMMENDED SAVINGS* | $151,881 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $151,881 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,446 | $90 |
$5,090
48,989
kWh
|
$1,356
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7224: Reduce space conditioning during non-working hours | $16,188 | - |
$12,036
115,845
kWh
|
- |
$4,152
-
MMBtu
|
- | - | |
| 03 | 2.6231: Utilize controls to operate equipment only when needed | $6,291 | $2,526 |
$6,291
60,544
kWh
|
- | - | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,873 | $39,842 |
$31,693
315,046
kWh
|
$5,216
-
kW-mo/yr
|
- | $1,014 | $(-2,050.0) | |
| 05 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $86,200 | $179,607 |
$68,071
655,160
kWh
|
$18,129
-
kW-mo/yr
|
- | - | - | |
| 06 | 2.7135: Install occupancy sensors | $883 | $3,334 |
$334
3,211
kWh
|
$549
-
kW-mo/yr
|
- | - | - | |
| TOTAL RECOMMENDED | $151,881 | $225,399 |
$123,515
1,198,795
kWh
|
$25,250
-
kW-mo/yr
|
$4,152
-
MMBtu
|
$1,014 | $(-2,050.0) | ||
| TOTAL IMPLEMENTED | $151,881 | $225,399 |
$123,515
1,198,795
kWh
|
$25,250
-
kW-mo/yr
|
$4,152
-
MMBtu
|
$1,014 | $(-2,050.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs