Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Treated Wastewater, Recycled Water
NAICS 562211: Hazardous Waste Treatment and Disposal
SIC 4953: Refuse Systems
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 1,600,000
ft2
Annual Production 4,380,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $384,745 3,702,913
kWh
Electricity Demand $364,805 18,058
kW-mo/yr
Natural Gas $77,129 23,874
MMBtu
TOTAL YEARLY COSTS $826,679
RECOMMENDED SAVINGS* $151,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $151,881

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,446 $90 $5,090
48,989
kWh
$1,356
-
kW-mo/yr
- - -
02 2.7224: Reduce space conditioning during non-working hours $16,188 - $12,036
115,845
kWh
- $4,152
-
MMBtu
- -
03 2.6231: Utilize controls to operate equipment only when needed $6,291 $2,526 $6,291
60,544
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $35,873 $39,842 $31,693
315,046
kWh
$5,216
-
kW-mo/yr
- $1,014 $(-2,050.0)
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $86,200 $179,607 $68,071
655,160
kWh
$18,129
-
kW-mo/yr
- - -
06 2.7135: Install occupancy sensors $883 $3,334 $334
3,211
kWh
$549
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $151,881 $225,399 $123,515
1,198,795
kWh
$25,250
-
kW-mo/yr
$4,152
-
MMBtu
$1,014 $(-2,050.0)
TOTAL IMPLEMENTED $151,881 $225,399 $123,515
1,198,795
kWh
$25,250
-
kW-mo/yr
$4,152
-
MMBtu
$1,014 $(-2,050.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs