ITAC Assessment: BS0053
ITAC logo
ITAC Assessment: BS0053
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Metal Heat Treating
NAICS 332811: Metal Heat Treating
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 16
Plant Area 17,000
ft2
Annual Production 173,680
lb
Production Hrs. Annual 4,160
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $265,220 3,700,829
kWh
Electricity Demand $84,528 13,488
kW-mo/yr
Natural Gas $59,647 7,992
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,321 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,692 $15 $1,450
20,133
kWh
$242
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $879 $910 $753
10,460
kWh
$126
-
kW-mo/yr
03 2.2511: Insulate bare equipment $826 $968 $826
11,474
kWh
-
04 2.2514: Cover open tanks $44 $50 $10
136
kWh
$34
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $660 $3,120 $531
7,379
kWh
$129
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $220 $600 $220
3,060
kWh
-
TOTAL RECOMMENDED $4,321 $5,663 $3,790
52,642
kWh
$531
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs