Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,992

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Coating, engraving, heat treating, and allied activities
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0010 #04 Y:2007 Analyze flue gas for proper air/fuel ratio $1,529 $450
DL0010 #03 Y:2007 Re-size charging openings or add movable cover or door $4,305 $225
DL0010 #02 Y:2007 Install smaller boiler (increase high fire duty cycle) $9,440 $2,500
DL0010 #01 Y:2007 Insulate glazing, walls, ceilings, and roofs $10,964 $2,872
MA0625 #05 Y:2007 Improve air circulation with destratification fans / other methods $3,964 $10,530
MA0625 #04 Y:2007 Turn off equipment when not in use $5,881 -
MA0625 #03 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $7,861 $14,400
MA0625 #02 Y:2007 Size electric motors for peak operating efficiency $8,935 $8,000
MA0625 #01 Y:2007 Use adjustable frequency drive or multiple speed motors on existing system $17,463 $31,000
UM0333 #07 Y:2007 Install compressor air intakes in coolest locations $1,455 $100
UM0333 #06 Y:2007 Recover waste heat from equipment $1,506 $1,060
UM0333 #05 Y:2007 Redesign process $2,329 $3,480
UM0333 #04 Y:2007 Utilize higher efficiency lamps and/or ballasts $4,589 $3,480
UM0333 #03 Y:2007 Reduce ventilation air $8,623 $100
UM0333 #02 Y:2007 Use waste heat from hot flue gases to preheat $8,803 $50,000
UM0333 #01 Y:2007 Analyze flue gas for proper air/fuel ratio $19,901 $2,000
BD0333 #08 Y:2007 Shift from daytime to nighttime operation $66,946 $2
BD0333 #07 Y:2007 Reduce the pressure of compressed air to the minimum required $378 $2
BD0333 #06 Y:2007 Install compressor air intakes in coolest locations $819 $526
BD0333 #05 Y:2007 Recover waste heat from equipment $67,989 $35,001