ITAC Assessment: DL0010
ITAC logo
ITAC Assessment: DL0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Chrome Plated Rolls,EDT Rolls
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area 16,000
ft2
Annual Production 21,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85 1,996
kWh
Electricity Demand $11 3,192
kW-mo/yr
Natural Gas $69,291 5,218
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,723 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $10,964 $2,872 - - $10,964
-
MMBtu
02 2.1223: Install smaller boiler (increase high fire duty cycle) $9,440 $2,500 - - $9,440
-
MMBtu
03 2.2531: Re-size charging openings or add movable cover or door $4,305 $225 - - $4,305
-
MMBtu
04 2.1233: Analyze flue gas for proper air/fuel ratio $1,529 $450 - - $1,529
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,409 - $1,409
17,617
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $622 $622 $572
7,153
kWh
$50
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $454 $524 $454
5,680
kWh
- -
TOTAL RECOMMENDED $28,723 $7,193 $2,435
30,450
kWh
$50
-
kW-mo/yr
$26,238
-
MMBtu
TOTAL IMPLEMENTED $18,207 $3,547 $1,409
17,617
kWh
- $16,798
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs