| Assessment Year | 2007 |
|---|---|
| Principal Product | Chrome Plated Rolls,EDT Rolls |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $1 M to 5M |
| # of Employees | 25 |
| Plant Area |
16,000
ft2
|
| Annual Production | 21,000
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $85 | 1,996 |
kWh
|
$0.043 |
| Electricity Demand | $11 | 3,192 |
kW-mo/yr
|
$0.003 |
| Natural Gas | $69,291 | 5,218 |
MMBtu
|
$13.28 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $28,723 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $18,207 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $10,964 | $2,872 | - | - |
$10,964
-
MMBtu
|
|
| 02 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $9,440 | $2,500 | - | - |
$9,440
-
MMBtu
|
|
| 03 | 2.2531: Re-size charging openings or add movable cover or door | $4,305 | $225 | - | - |
$4,305
-
MMBtu
|
|
| 04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,529 | $450 | - | - |
$1,529
-
MMBtu
|
|
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,409 | - |
$1,409
17,617
kWh
|
- | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $622 | $622 |
$572
7,153
kWh
|
$50
-
kW-mo/yr
|
- | |
| 07 | 2.7135: Install occupancy sensors | $454 | $524 |
$454
5,680
kWh
|
- | - | |
| TOTAL RECOMMENDED | $28,723 | $7,193 |
$2,435
30,450
kWh
|
$50
-
kW-mo/yr
|
$26,238
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $18,207 | $3,547 |
$1,409
17,617
kWh
|
- |
$16,798
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs