ITAC Assessment: MA0682
ITAC logo
ITAC Assessment: MA0682
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Braided PTFE Hoses
NAICS 326220: Rubber and Plastics Hoses and Belting Manufacturing
SIC 3052: Rubber and Plastics Hose and Belting
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 110,000
ft2
Annual Production 11,000
thousand feet
Production Hrs. Annual 6,732
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $659,370 5,936,448
kWh
Electricity Demand $89,391 12,614
kW-mo/yr
Electricity Fees $42,873 -
Natural Gas $267,331 26,677
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,174 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,770

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.2426: Use waste heat from flue gases to heat space conditioning air $29,366 $91,950 $(-2,568.0)
(-24,226)
kWh
$31,934
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $25,038 $57,600 $39,926
376,658
kWh
$(-14,888.0)
-
MMBtu
-
03 2.8121: Apply for tax-free status for energy purchases $11,594 - - - $11,594
04 2.7245: Use direct air supply to exhaust hoods $10,708 $29,760 $(-2,566.0)
(-24,566)
kWh
$13,274
-
MMBtu
-
05 2.4239: Eliminate or reduce compressed air usage $6,468 $7,325 $6,468
61,020
kWh
- -
TOTAL RECOMMENDED $83,174 $186,635 $41,260
388,886
kWh
$30,320
-
MMBtu
$11,594
TOTAL IMPLEMENTED $28,770 $37,085 $3,902
36,454
kWh
$13,274
-
MMBtu
$11,594
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs