ITAC Assessment: MU0004
ITAC logo
ITAC Assessment: MU0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Interior automobile parts
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 490
Plant Area 182,000
ft2
Annual Production 7,800,000
pieces
Production Hrs. Annual 5,750
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $550,233 6,996,040
kWh
Electricity Demand $85,489 3,665
kW-mo/yr
Natural Gas $50,069 6,820
MMBtu
TOTAL YEARLY COSTS $685,792
RECOMMENDED SAVINGS* $14,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,546

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $6,123 - $3,788
47,955
kWh
$2,334
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,089 $4,922 $3,686
46,664
kWh
$2,403
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $845 $2,773 $845
10,577
kWh
- - -
04 2.6218: Turn off equipment when not in use $673 - $673
8,409
kWh
- - -
05 2.3132: Recharge batteries on during off-peak demand periods $250 - - - $250 -
06 2.8112: Combine utility meters $180 - - - $180 -
07 2.7444: Close holes and openings in building such as broken windows $58 $77 - - - $58
-
MMBtu
TOTAL RECOMMENDED $14,218 $7,772 $8,993
113,605
kWh
$4,737
-
kW-mo/yr
$430 $58
-
MMBtu
TOTAL IMPLEMENTED $13,546 $7,772 $8,320
105,196
kWh
$4,737
-
kW-mo/yr
$430 $58
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs