ITAC Assessment: BD0333
ITAC logo
ITAC Assessment: BD0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Painted Steel, Steel Tubing
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3317: Steel Pipe and Tubes
Sales Range $10
M
to 50
M
# of Employees 89
Plant Area 200,000
ft2
Annual Production 72,000
ton
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $294,841 5,080,320
kWh
Electricity Demand $83,683 37,695
kW-mo/yr
Natural Gas $387,740 42,081
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $247,656 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,143

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7135: Install occupancy sensors $1,570 $901 $1,296
75
kWh
$274
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $376 $476 $332
5
kWh
$16
-
kW-mo/yr
- $12 $16
03 2.1133: Adjust burners for efficient operation $36,206 $15,001 - - $36,206
-
MMBtu
- -
04 2.7231: Use radiant heater for spot heating $73,372 $30,001 $975
15,522
kWh
$106
-
kW-mo/yr
$72,291
-
MMBtu
- -
05 2.2437: Recover waste heat from equipment $67,989 $35,001 - - $67,989
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $819 $526 $679
39
kWh
$140
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $378 $2 $313
18
kWh
$65
-
kW-mo/yr
- - -
08 2.3134: Shift from daytime to nighttime operation $66,946 $2 - $66,946
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $247,656 $81,910 $3,595
15,659
kWh
$67,547
-
kW-mo/yr
$176,486
-
MMBtu
$12 $16
TOTAL IMPLEMENTED $3,143 $1,905 $2,620
137
kWh
$495
-
kW-mo/yr
- $12 $16
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs