1,980
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| LL0290 #05 Y:2007 | 05 | 2007 | Conserve energy by efficient use of vending machines | $648 | $775 | |
| LL0290 #04 Y:2007 | 04 | 2007 | Reduce illumination to minimum necessary levels | $7,191 | $615 | |
| LL0290 #03 Y:2007 | 03 | 2007 | Insulate bare equipment | $8,437 | $3,364 | |
| LL0290 #02 Y:2007 | 02 | 2007 | Repair and eliminate steam leaks | $11,156 | $3,650 | |
| LL0290 #01 Y:2007 | 01 | 2007 | Eliminate leaks in inert gas and compressed air lines/ valves | $35,461 | $8,520 | |
| DL0010 #07 Y:2007 | 07 | 2007 | Install occupancy sensors | $454 | $524 | |
| DL0010 #06 Y:2007 | 06 | 2007 | Utilize energy-efficient belts and other improved mechanisms | $622 | $622 | |
| DL0010 #05 Y:2007 | 05 | 2007 | Reduce the pressure of compressed air to the minimum required | $1,409 | - | |
| DL0010 #04 Y:2007 | 04 | 2007 | Analyze flue gas for proper air/fuel ratio | $1,529 | $450 | |
| DL0010 #03 Y:2007 | 03 | 2007 | Re-size charging openings or add movable cover or door | $4,305 | $225 | |
| DL0010 #02 Y:2007 | 02 | 2007 | Install smaller boiler (increase high fire duty cycle) | $9,440 | $2,500 | |
| DL0010 #01 Y:2007 | 01 | 2007 | Insulate glazing, walls, ceilings, and roofs | $10,964 | $2,872 | |
| MA0625 #05 Y:2007 | 05 | 2007 | Improve air circulation with destratification fans / other methods | $3,964 | $10,530 | |
| MA0625 #04 Y:2007 | 04 | 2007 | Turn off equipment when not in use | $5,881 | - | |
| MA0625 #03 Y:2007 | 03 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $7,861 | $14,400 | |
| MA0625 #02 Y:2007 | 02 | 2007 | Size electric motors for peak operating efficiency | $8,935 | $8,000 | |
| MA0625 #01 Y:2007 | 01 | 2007 | Use adjustable frequency drive or multiple speed motors on existing system | $17,463 | $31,000 | |
| UM0333 #07 Y:2007 | 07 | 2007 | Install compressor air intakes in coolest locations | $1,455 | $100 | |
| UM0333 #06 Y:2007 | 06 | 2007 | Recover waste heat from equipment | $1,506 | $1,060 | |
| UM0333 #05 Y:2007 | 05 | 2007 | Redesign process | $2,329 | $3,480 |