Assessment Year | 2008 |
---|---|
Principal Product | Metal Cating |
NAICS | 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers |
SIC | 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
135,000
ft2
|
Annual Production | 75,000
thousand feet
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $613,834 | 8,296,974 |
kWh
|
$0.074 |
Electricity Demand | $150,265 | 16,971 |
kW-mo/yr
|
$8.85 |
Electricity Fees | $2,587 | - |
|
- |
Natural Gas | $1,093,321 | 160,790 |
MMBtu
|
$6.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,263 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,461 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $35,461 | $8,520 |
$35,341
477,705
kWh
|
- | $120 | - | - | |
02 | 2.2135: Repair and eliminate steam leaks | $11,156 | $3,650 | - | - | - |
$11,156
-
MMBtu
|
- | |
03 | 2.2511: Insulate bare equipment | $8,437 | $3,364 | - | - | - |
$8,437
-
MMBtu
|
- | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $7,191 | $615 |
$6,008
81,207
kWh
|
$1,159
-
kW-mo/yr
|
$24 | - | - | |
05 | 2.6211: Conserve energy by efficient use of vending machines | $648 | $775 |
$646
8,736
kWh
|
- | $2 | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $293 | $175 |
$123
1,664
kWh
|
$18
-
kW-mo/yr
|
- | - | $152 | |
07 | 2.4239: Eliminate or reduce compressed air usage | $77 | $483 |
$77
1,047
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $63,263 | $17,582 |
$42,195
570,359
kWh
|
$1,177
-
kW-mo/yr
|
$146 |
$19,593
-
MMBtu
|
$152 | ||
TOTAL IMPLEMENTED | $35,461 | $8,520 |
$35,341
477,705
kWh
|
- | $120 | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs