Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,980

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Coating, engraving, heat treating, and allied activities
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
TT0029 #02 Y:2008 Insulate bare equipment $52,700 $1,000
TT0029 #01 Y:2008 Utilize higher efficiency lamps and/or ballasts $6,600 $12,000
SF0359 #09 Y:2008 Use solar heat to make electricty $40,974 $1,575,000
SF0359 #08 Y:2008 Install occupancy sensors $955 $6,455
SF0359 #07 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $929 $4,808
SF0359 #06 Y:2008 Use most efficient type of electric motors $197 $453
SF0359 #05 Y:2008 Use adjustable frequency drive or multiple speed motors on existing system $1,881 $6,200
SF0359 #04 Y:2008 Replace electrically-operated equipment with fossil fuel equipment $2,314 $1,577
SF0359 #03 Y:2008 Utilize higher efficiency lamps and/or ballasts $1,576 $523
SF0359 #02 Y:2008 Turn off equipment when not in use $870 $904
SF0359 #01 Y:2008 Reschedule plant operations or reduce load to avoid peaks $4,430 -
AM0543 #05 Y:2008 Sell oil to recycler $289 $837
AM0543 #04 Y:2008 Make a practice of turning off lights when not needed $205 $54
AM0543 #03 Y:2008 Utilize higher efficiency lamps and/or ballasts $627 -
AM0543 #02 Y:2008 Install skylights $3,050 $1,760
AM0543 #01 Y:2008 Use waste heat from hot flue gases to preheat $95,000 $175,000
MI0164 #11 Y:2007 Utilize energy-efficient belts and other improved mechanisms $842 -
MI0164 #10 Y:2007 Install vinyl strip / high speed / air curtain doors $3,174 $260
MI0164 #09 Y:2007 Eliminate leaks in inert gas and compressed air lines/ valves $10,992 $1,032
MI0164 #08 Y:2007 Use optimum size and capacity equipment $5,657 $4,400