ITAC Assessment: SF0359
ITAC logo
ITAC Assessment: SF0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Metal and Plastic Original Equipment Manufacturer (OEM) Labels
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 1,600,000
pieces
Production Hrs. Annual 2,860
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,697 880,480
kWh
Electricity Demand $17,666 4,530
kW-mo/yr
Electricity Fees $5,838 -
Natural Gas $11,154 903
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,126 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,316

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,430 - - $4,430
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $870 $904 $792
5,876
kWh
$78
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,576 $523 $1,424
10,565
kWh
$152
-
kW-mo/yr
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,314 $1,577 $1,893
14,040
kWh
$421
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,881 $6,200 $1,881
13,954
kWh
-
06 2.4133: Use most efficient type of electric motors $197 $453 $158
1,171
kWh
$39
-
kW-mo/yr
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $929 $4,808 $828
6,140
kWh
$101
-
kW-mo/yr
08 2.7135: Install occupancy sensors $955 $6,455 $791
5,869
kWh
$164
-
kW-mo/yr
09 2.9114: Use solar heat to make electricty $40,974 $1,575,000 $34,059
252,642
kWh
$6,915
-
kW-mo/yr
TOTAL RECOMMENDED $54,126 $1,595,920 $41,826
310,257
kWh
$12,300
-
kW-mo/yr
TOTAL IMPLEMENTED $10,316 $8,265 $5,095
37,792
kWh
$5,221
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs