ITAC Assessment: WI0410
ITAC logo
ITAC Assessment: WI0410
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Custom furniture
NAICS
n/a
SIC 2517: Wood Television, Radio, Phonograph, and Sewing Machine Cabinets
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 13,000
pieces
Production Hrs. Annual 4,275
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $183,505 2,446,109
kWh
Electricity Demand $79,883 8,069
kW-mo/yr
Electricity Fees $17,982 -
Natural Gas $91,237 10,824
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,749 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,530

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $8,178 $4,800 $(-241.0)
(-6,584)
kWh
- $8,419
-
MMBtu
02 2.7261: Install timers and/or thermostats $5,395 $600 - - $5,395
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $5,443 - - $5,443
-
kW-mo/yr
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $4,636 $1,050 $(-16.0)
(-446)
kWh
- $4,652
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,885 $20,800 $3,885
106,135
kWh
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,015 $1,657 $1,876
51,278
kWh
$1,139
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,255 $7,140 $1,408
34,489
kWh
$847
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $942 $740 $589
16,095
kWh
$353
-
kW-mo/yr
-
TOTAL RECOMMENDED $33,749 $36,787 $7,501
200,967
kWh
$7,782
-
kW-mo/yr
$18,466
-
MMBtu
TOTAL IMPLEMENTED $17,530 $7,797 $2,224
60,789
kWh
$1,492
-
kW-mo/yr
$13,814
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings