ITAC Assessment: MI0164
ITAC logo
ITAC Assessment: MI0164
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Electroplated Switches
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 88,000
ft2
Annual Production 4,223,000
pieces
Production Hrs. Annual 4,625
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,019,618 7,244,820
kWh
Electricity Demand $181,523 17,551
kW-mo/yr
Electricity Fees $5,400 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $276,066 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $255,840

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $114,642 $3,960 $96,118
686,529
kWh
$18,524
-
kW-mo/yr
02 2.7221: Lower temperature during the winter season and vice-versa $80,047 $6,886 $74,370
384,436
kWh
$5,677
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $10,553 $22,366 $8,855
63,242
kWh
$1,698
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $12,799 $40 $11,135
78,901
kWh
$1,664
-
kW-mo/yr
05 2.4323: Use optimum size and capacity equipment $8,597 $4,400 $8,288
58,724
kWh
$309
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,466 $1,032 $18,959
20,452
kWh
$1,507
-
kW-mo/yr
07 2.4231: Reduce the pressure of compressed air to the minimum required $8,297 $40 $6,676
47,305
kWh
$1,621
-
kW-mo/yr
08 2.4323: Use optimum size and capacity equipment $5,657 $4,400 $5,068
35,907
kWh
$589
-
kW-mo/yr
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,992 $1,032 $7,595
53,815
kWh
$3,397
-
kW-mo/yr
10 2.7447: Install vinyl strip / high speed / air curtain doors $3,174 $260 $2,884
20,438
kWh
$290
-
kW-mo/yr
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $842 - $818
5,796
kWh
$24
-
kW-mo/yr
TOTAL RECOMMENDED $276,066 $44,416 $240,766
1,455,545
kWh
$35,300
-
kW-mo/yr
TOTAL IMPLEMENTED $255,840 $17,390 $223,141
1,330,162
kWh
$32,699
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs