| Assessment Year | 2015 |
|---|---|
| Principal Product | Zinc and Aluminum Anodes |
| NAICS | 331523: Nonferrous Metal Die-Casting Foundries |
| SIC | 3363: Aluminum Die-Castings |
| Sales Range | $5 M to 10M |
| # of Employees | 48 |
| Plant Area |
26,000
ft2
|
| Annual Production | 1,214,789
pieces
|
| Production Hrs. Annual | 2,125
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $60,223 | 501,533 |
kWh
|
$0.12 |
| Electricity Demand | $26,142 | 2,445 |
kW-mo/yr
|
$10.69 |
| Electricity Fees | $6,161 | - |
|
- |
| Natural Gas | $53,995 | 8,128 |
MMBtu
|
$6.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,053 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $26,723 | $60,280 | - | - |
$26,723
-
MMBtu
|
|
| 02 | 2.7232: Replace existing hvac unit with high efficiency model | $9,705 | $25,900 |
$5,649
47,038
kWh
|
$4,056
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,578 | $13,930 |
$3,026
25,202
kWh
|
$1,552
-
kW-mo/yr
|
- | |
| 04 | 2.4133: Use most efficient type of electric motors | $1,761 | $4,200 |
$1,152
9,588
kWh
|
$609
-
kW-mo/yr
|
- | |
| 05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,701 | $1,700 |
$1,071
8,918
kWh
|
$630
-
kW-mo/yr
|
- | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,585 | $200 |
$1,585
13,199
kWh
|
- | - | |
| TOTAL RECOMMENDED | $46,053 | $106,210 |
$12,483
103,945
kWh
|
$6,847
-
kW-mo/yr
|
$26,723
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs