ITAC Assessment: SD0518
ITAC logo
ITAC Assessment: SD0518
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Zinc and Aluminum Anodes
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 48
Plant Area 26,000
ft2
Annual Production 1,214,789
pieces
Production Hrs. Annual 2,125
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,223 501,533
kWh
Electricity Demand $26,142 2,445
kW-mo/yr
Electricity Fees $6,161 -
Natural Gas $53,995 8,128
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $26,723 $60,280 - - $26,723
-
MMBtu
02 2.7232: Replace existing hvac unit with high efficiency model $9,705 $25,900 $5,649
47,038
kWh
$4,056
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,578 $13,930 $3,026
25,202
kWh
$1,552
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $1,761 $4,200 $1,152
9,588
kWh
$609
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,701 $1,700 $1,071
8,918
kWh
$630
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,585 $200 $1,585
13,199
kWh
- -
TOTAL RECOMMENDED $46,053 $106,210 $12,483
103,945
kWh
$6,847
-
kW-mo/yr
$26,723
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs