ITAC Assessment: RU0010
ITAC logo
ITAC Assessment: RU0010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CAMPING EQUIPMENT
NAICS
n/a
SIC 2394: Canvas and Related Products
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area
n/a
Annual Production 822,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,918 427,315
kWh
Natural Gas $20,511 3,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,096 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,428

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $556 $400 $556
5,569
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $600 - $600
6,155
kWh
-
03 2.4312: Improve lubrication practices $120 - $120
1,172
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $12 - $12
293
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $696 $450 - $696
-
MMBtu
06 2.7243: Improve air circulation with destratification fans / other methods $1,458 $2,250 - $1,458
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $654 $316 $654
6,741
kWh
-
TOTAL RECOMMENDED $4,096 $3,416 $1,942
19,930
kWh
$2,154
-
MMBtu
TOTAL IMPLEMENTED $1,428 $450 $732
7,620
kWh
$696
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs