ITAC Assessment: MS0359
ITAC logo
ITAC Assessment: MS0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Plywood
NAICS 321212: Softwood Veneer and Plywood Manufacturing
SIC 2436: Softwood Veneer and Plywood
Sales Range $10
M
to 50
M
# of Employees 292
Plant Area 400,000
ft2
Annual Production 190,000
thousand feet
Production Hrs. Annual 8,400
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $414,763 33,444,600
kWh
Electricity Demand $405,204 75,739
kW-mo/yr
Electricity Fees $1,872,184 -
Natural Gas $134,705 1,489
MMBtu
Wood $757,011 779,620
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,345 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,031

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Wood Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $67,464 $34,894 $11,848
972,780
kWh
$346
-
kW-mo/yr
$55,270 -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $9,253 $1,635 $1,618
132,844
kWh
$88
-
kW-mo/yr
$7,547 -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,778 $241 $1,197
98,237
kWh
- $5,581 -
04 2.2136: Install / repair insulation on steam lines $2,850 $2,432 - - - $2,850
-
MMBtu
TOTAL RECOMMENDED $86,345 $39,202 $14,663
1,203,861
kWh
$434
-
kW-mo/yr
$68,398 $2,850
-
MMBtu
TOTAL IMPLEMENTED $16,031 $1,876 $2,815
231,081
kWh
$88
-
kW-mo/yr
$13,128 -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs