matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
IP0213 #10 Y:2025 | 10 | 2025 | Utilize higher efficiency lamps and/or ballasts | $7,498 | $13,433 |
n/a
|
IP0213 #09 Y:2025 | 09 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $23,151 | $26,250 |
n/a
|
IP0213 #08 Y:2025 | 08 | 2025 | Use heat from boiler blowdown to preheat boiler feed water | $48,428 | $56,200 |
n/a
|
IP0213 #07 Y:2025 | 07 | 2025 | Reduce space conditioning during non-working hours | $825 | $340 |
n/a
|
IP0213 #06 Y:2025 | 06 | 2025 | Replace hydraulic / pneumatic equipment with electric equipment | $9,346 | $3,710 |
n/a
|
IP0213 #05 Y:2025 | 05 | 2025 | Install occupancy sensors | $953 | $280 |
n/a
|
IP0213 #04 Y:2025 | 04 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $40,943 | $4,528 |
n/a
|
IP0213 #03 Y:2025 | 03 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $10,374 | $270 |
n/a
|
IP0213 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $15,623 | $640 |
n/a
|
IP0213 #01 Y:2025 | 01 | 2025 | Install compressor air intakes in coolest locations | $1,494 | - |
n/a
|
CI0049 #11 Y:2025 | 11 | 2025 | Use most efficient type of electric motors | $918 | $470 |
n/a
|
CI0049 #10 Y:2025 | 10 | 2025 | Preheat combustion air with waste heat | $5,572 | $11,000 |
n/a
|
CI0049 #09 Y:2025 | 09 | 2025 | Replace fossil fuel equipment with electrical equipment | $9,652 | $40,000 |
n/a
|
CI0049 #08 Y:2025 | 08 | 2025 | Use power during off-peak periods | $13,567 | $22,000 |
n/a
|
CI0049 #07 Y:2025 | 07 | 2025 | Adopt in-house material generation | $13,673 | $175,000 |
n/a
|
CI0049 #06 Y:2025 | 06 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $14,474 | $5,000 |
n/a
|
CI0049 #05 Y:2025 | 05 | 2025 | Adjust burners for efficient operation | $16,500 | $44,000 |
n/a
|
CI0049 #04 Y:2025 | 04 | 2025 | Use battery storage for demand control | $17,261 | $58,000 |
n/a
|
CI0049 #03 Y:2025 | 03 | 2025 | Adopt in-house material generation | $18,814 | $22,000 |
n/a
|
CI0049 #02 Y:2025 | 02 | 2025 | Replace fossil fuel equipment with electrical equipment | $28,480 | $125,000 |
n/a
|