2,058
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1139 #06 Y:2026 | 06 | 2026 | Optimize plant power factor | $7,031 | $18,291 |
n/a
|
| UD1139 #05 Y:2026 | 05 | 2026 | Utilize higher efficiency lamps and/or ballasts | $11,899 | $20,626 |
n/a
|
| UD1139 #04 Y:2026 | 04 | 2026 | Re-use or recycle hot or cold process exhaust air | $38,983 | $15,000 |
n/a
|
| UD1139 #03 Y:2026 | 03 | 2026 | Install compressor air intakes in coolest locations | $3,681 | $4,800 |
n/a
|
| UD1139 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $4,391 | - |
n/a
|
| UD1139 #01 Y:2026 | 01 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,028 | $1,000 |
n/a
|
| SD0690 #14 Y:2026 | 14 | 2026 | Use heat pump for space conditioning | $16,262 | $29,800 |
n/a
|
| SD0690 #13 Y:2026 | 13 | 2026 | Replace obsolete burners with more efficient ones | $6,945 | $8,300 |
n/a
|
| SD0690 #12 Y:2026 | 12 | 2026 | Replace existing hvac unit with high efficiency model | $3,172 | $5,500 |
n/a
|
| SD0690 #11 Y:2026 | 11 | 2026 | Use most efficient type of electric motors | $34,215 | $9,487 |
n/a
|
| SD0690 #10 Y:2026 | 10 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $19,921 | - |
n/a
|
| SD0690 #09 Y:2026 | 09 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $10,897 | $11,400 |
n/a
|
| SD0690 #08 Y:2026 | 08 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $357 | $1,271 |
n/a
|
| SD0690 #07 Y:2026 | 07 | 2026 | Reduce the pressure of compressed air to the minimum required | $1,060 | - |
n/a
|
| SD0690 #06 Y:2026 | 06 | 2026 | Use / purchase optimum sized compressor | $826 | $1,230 |
n/a
|
| SD0690 #05 Y:2026 | 05 | 2026 | Install direct acting units in place of compressed air pressure system in safety system | $335 | $600 |
n/a
|
| SD0690 #04 Y:2026 | 04 | 2026 | Use battery storage for demand control | $150,344 | $206,780 |
n/a
|
| SD0690 #03 Y:2026 | 03 | 2026 | Use solar heat to make electricty | $90,071 | $134,797 |
n/a
|
| SD0690 #02 Y:2026 | 02 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $4,062 | $5,475 |
n/a
|
| SD0690 #01 Y:2026 | 01 | 2026 | Use cascade system of recirculating during cold weather to avoid sub-cooling | $16,696 | $2,250 |
n/a
|