ITAC Assessment: MU0080
ITAC logo
ITAC Assessment: MU0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product parts washing and finishing
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 64
Plant Area 60,000
ft2
Annual Production 250,000,000
units
Production Hrs. Annual 4,160
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $177,622 1,855,500
kWh
Electricity Fees $360 -
Natural Gas $31,815 4,660
MMBtu
Other Gas $814 1
MMBtu
Waste Disposal Costs
Water Usage $51,477 7,569
Tgal
TOTAL YEARLY COSTS $262,088
RECOMMENDED SAVINGS* $141,323 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4322: Use or replace with energy efficient substitutes $69,585 $430,000 $69,585
724,843
kWh
- -
02 2.8114: Change rate schedules or other changes in utility service $48,342 - - $48,342 -
03 2.2511: Insulate bare equipment $435 $802 - - $435
-
MMBtu
04 2.2511: Insulate bare equipment $104 $177 - - $104
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,641 $94,050 $13,641
142,098
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $6,618 - $6,618
68,935
kWh
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $357 $80 $357
3,719
kWh
- -
08 2.4322: Use or replace with energy efficient substitutes $338 $4,011 $338
3,526
kWh
- -
09 2.7134: Use photocell controls $108 $862 $108
1,125
kWh
- -
10 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $1,655 $4,295 - - $1,655
-
MMBtu
11 2.7492: Use proper thickness of insulation on building envelope $140 $281 $39
402
kWh
- $101
-
MMBtu
TOTAL RECOMMENDED $141,323 $534,557 $90,686
944,648
kWh
$48,342 $2,295
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs