ITAC Assessment: UM0383
ITAC logo
ITAC Assessment: UM0383
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product platings and coatings
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 125,000
ft2
Annual Production 100,000,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $264,680 5,320,061
kWh
Electricity Demand $182,652 13,031
kW-mo/yr
Natural Gas $540,703 82,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $197,381 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,263 $23,909 $6,337
127,384
kWh
$3,926
-
kW-mo/yr
- - -
02 2.3212: Optimize plant power factor $9,728 $5,670 - - $9,728 - -
03 2.4224: Upgrade controls on compressors $3,151 $7,125 $3,151
63,336
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,089 $1,291 $2,089
41,992
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $1,601 $7,500 $1,601
32,174
kWh
- - - -
06 2.2442: Preheat combustion air with waste heat $3,466 $4,400 - - - $3,466
-
MMBtu
-
07 2.2414: Use waste heat from hot flue gases to preheat $3,452 $7,236 - - - $3,452
-
MMBtu
-
08 2.2136: Install / repair insulation on steam lines $1,035 $1,207 - - - $1,035
-
MMBtu
-
09 3.4113: Treat and reuse rinse waters $60,914 $25,231 - - - - $60,914
-
Tgal
10 2.2447: Heat water with exhaust heat $101,682 $74,000 - - - $101,682
-
MMBtu
-
TOTAL RECOMMENDED $197,381 $157,569 $13,178
264,886
kWh
$3,926
-
kW-mo/yr
$9,728 $109,635
-
MMBtu
$60,914
-
Tgal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs