ITAC Assessment: MZ0387
ITAC logo
ITAC Assessment: MZ0387
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product galvanizing metal parts
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 18,000
ft2
Annual Production 19,407,344
lb
Production Hrs. Annual 2,520
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,775 269,371
kWh
Electricity Demand $2,945 450
kW-mo/yr
Natural Gas $96,731 21,138
MMBtu
Waste Disposal Costs
Water Usage $3,148 321
Tgal
Water Disposal $5,642 321
Tgal
TOTAL YEARLY COSTS $139,241
RECOMMENDED SAVINGS* $524,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,938 $3,300 $1,938
17,002
kWh
- -
02 2.2122: Install / repair insulation on condensate lines $1,500 $5,174 - $1,500
-
MMBtu
-
03 2.7135: Install occupancy sensors $84 $245 $84
732
kWh
- -
04 2.2314: Replace heat treating oven with more efficient unit $518,165 $870,000 - $5,899
-
MMBtu
$512,266
05 2.2442: Preheat combustion air with waste heat $2,337 $6,500 - $2,337
-
MMBtu
-
TOTAL RECOMMENDED $524,024 $885,219 $2,022
17,734
kWh
$9,736
-
MMBtu
$512,266
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs