ITAC Assessment: NT0058
ITAC logo
ITAC Assessment: NT0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Aircrafts repair and assembly
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 354
Plant Area 1,000,000
ft2
Annual Production 812
units
Production Hrs. Annual 6,221
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $135,150 1,613,632
kWh
Electricity Demand $48,908 4,351
kW-mo/yr
Electricity Fees $4,228 -
Natural Gas $42,849 4,053
MMBtu
Waste Disposal Costs
Water Usage $27,488 6
Tgal
TOTAL YEARLY COSTS $258,623
RECOMMENDED SAVINGS* $356,569 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4321: Upgrade obsolete equipment $169,994 $103,634 $10,287
122,757
kWh
$2,957
-
kW-mo/yr
- - $156,750
02 2.7232: Replace existing hvac unit with high efficiency model $105,430 $139,090 $1,729
20,636
kWh
- - - $103,701
03 2.7442: Keep doors and windows shut when not on use $47,399 - $25,188
300,568
kWh
- - $22,211
-
MMBtu
-
04 2.8121: Apply for tax-free status for energy purchases $18,987 $5,000 - - $18,987 - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,489 $5,753 $4,361
52,039
kWh
$1,128
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,608 $6,871 $2,212
26,398
kWh
$1,396
-
kW-mo/yr
- - -
07 2.3212: Optimize plant power factor $3,187 $2,003 - - $3,187 - -
08 2.7221: Lower temperature during the winter season and vice-versa $2,475 - $2,475
29,534
kWh
- - - -
TOTAL RECOMMENDED $356,569 $262,351 $46,252
551,932
kWh
$5,482
-
kW-mo/yr
$22,174 $22,211
-
MMBtu
$260,451
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs