ITAC Assessment: UD0246
ITAC logo
ITAC Assessment: UD0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product ALUMINUM COOKWARE
NAICS
n/a
SIC 3589: Service Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area
n/a
Annual Production 700,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $270,396 3,109,320
kWh
Natural Gas $66,824 11,299
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,486 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,315

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,261 - $4,261
-
kWh
- -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $19,946 $100,000 $27,259
276,964
kWh
$(-7,313.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,694 $32,400 $12,256
163,540
kWh
$(-1,618.0)
-
MMBtu
$56
05 2.2511: Insulate bare equipment $4,414 $3,400 - $4,414
-
MMBtu
-
06 2.2414: Use waste heat from hot flue gases to preheat $2,171 $4,000 - $2,171
-
MMBtu
-
TOTAL RECOMMENDED $41,486 $139,800 $43,776
440,504
kWh
$(-2,346.0)
-
MMBtu
$56
TOTAL IMPLEMENTED $39,315 $135,800 $43,776
440,504
kWh
$(-4,517.0)
-
MMBtu
$56
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs