Assessment Year | 1987 |
---|---|
Principal Product | ALUMINUM COOKWARE |
NAICS |
n/a
|
SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 160 |
Plant Area |
n/a
|
Annual Production | 700,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $270,396 | 3,109,320 |
kWh
|
$0.087 |
Natural Gas | $66,824 | 11,299 |
MMBtu
|
$5.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $41,486 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $39,315 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,261 | - |
$4,261
-
kWh
|
- | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $19,946 | $100,000 |
$27,259
276,964
kWh
|
$(-7,313.0)
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,694 | $32,400 |
$12,256
163,540
kWh
|
$(-1,618.0)
-
MMBtu
|
$56 | |
05 | 2.2511: Insulate bare equipment | $4,414 | $3,400 | - |
$4,414
-
MMBtu
|
- | |
06 | 2.2414: Use waste heat from hot flue gases to preheat | $2,171 | $4,000 | - |
$2,171
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $41,486 | $139,800 |
$43,776
440,504
kWh
|
$(-2,346.0)
-
MMBtu
|
$56 | ||
TOTAL IMPLEMENTED | $39,315 | $135,800 |
$43,776
440,504
kWh
|
$(-4,517.0)
-
MMBtu
|
$56 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs