ITAC Assessment: UD0687
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Coolant filtration equip.
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3569: General Industrial Machinery and Equipment, Not Elsewhere
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 130,000
ft2
Annual Production 2,200,000
lb
Production Hrs. Annual 2,125
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,647 1,149,140
kWh
Electricity Demand $75,156 5,496
kW-mo/yr
Natural Gas $51,845 7,508
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,793 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $4,973 $1,000 $2,617
67,109
kWh
$2,356
-
kW-mo/yr
- -
02 2.7447: Install vinyl strip / high speed / air curtain doors $4,400 $1,230 - - $4,400
-
MMBtu
-
03 2.8114: Change rate schedules or other changes in utility service $4,090 - - - - $4,090
04 3.1191: Change procedures / equipment / operating conditions $3,420 $9,650 $1,565
40,160
kWh
$1,855
-
kW-mo/yr
- -
05 2.5111: Convert from indirect to direct fired systems $2,740 $540 $170
4,409
kWh
- $2,570
-
MMBtu
-
06 2.7122: Disconnect ballasts $2,430 $2,610 $1,660
42,500
kWh
$770
-
kW-mo/yr
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,030 $2,350 $930
23,800
kWh
$1,100
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $365 $450 $165
4,250
kWh
$200
-
kW-mo/yr
- -
09 4.821: Pay bills on time to avoid late fees $180 $649 $147
3,757
kWh
$33
-
kW-mo/yr
- -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $165 $15 $75
1,910
kWh
$90
-
kW-mo/yr
- -
TOTAL RECOMMENDED $24,793 $18,494 $7,329
187,895
kWh
$6,404
-
kW-mo/yr
$6,970
-
MMBtu
$4,090
TOTAL IMPLEMENTED $7,933 $4,075 $4,517
115,769
kWh
$3,416
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs