ITAC Assessment: MZ0389
ITAC logo
ITAC Assessment: MZ0389
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product hot dip galvanized steel
NAICS 332812: Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers
SIC 3479: Coating, Engraving, and Allied Services, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 28,450
ft2
Annual Production 38,610,457
lb
Production Hrs. Annual 3,024
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,388 1,040,908
kWh
Electricity Demand $8,446 2,031
kW-mo/yr
Natural Gas $174,800 72,843
MMBtu
Waste Disposal Costs
Water Usage $15,980 1,440
Tgal
Water Disposal $14,514 1,427
Tgal
TOTAL YEARLY COSTS $299,128
RECOMMENDED SAVINGS* $9,790 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $842 - $787
9,592
kWh
$55
-
kW-mo/yr
-
02 2.7134: Use photocell controls $525 $1,430 $525
6,400
kWh
- -
03 2.2425: Use flue gases to heat process or service water $8,345 $68,000 - - $8,345
-
MMBtu
04 2.7135: Install occupancy sensors $78 $300 $78
946
kWh
- -
TOTAL RECOMMENDED $9,790 $69,730 $1,390
16,938
kWh
$55
-
kW-mo/yr
$8,345
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs