Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product ICE CREAM FLAVORS
NAICS
n/a
SIC 2087: Flavoring Extracts and Flavoring Syrups, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 128
Plant Area
n/a
Annual Production 27,748,164
lb
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,422 2,024,912
kWh
Natural Gas $96,655 22,493
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,312 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $369 $608 $369
6,155
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $185 - $185
3,224
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $451 $181 $451
7,620
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $132 $649 $132
2,345
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $774 $20 $774
12,896
kWh
06 2.4221: Install compressor air intakes in coolest locations $401 $292 $401
6,741
kWh
TOTAL RECOMMENDED $2,312 $1,750 $2,312
38,981
kWh
TOTAL IMPLEMENTED $2,312 $1,750 $2,312
38,981
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs