matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| AM0618 #01 Y:2012 | 01 | 2012 | Use a less expensive method of waste removal | $23,700 | - | |
| MZ0093 #06 Y:2012 | 06 | 2012 | Lower temperature during the winter season and vice-versa | $9,502 | - | |
| MZ0093 #05 Y:2012 | 05 | 2012 | Optimize plant power factor | $21,600 | $15,000 | |
| MZ0093 #04 Y:2012 | 04 | 2012 | Install compressor air intakes in coolest locations | $4,388 | $1,120 | |
| MZ0093 #03 Y:2012 | 03 | 2012 | Install occupancy sensors | $1,224 | $700 | |
| MZ0093 #02 Y:2012 | 02 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,852 | $2,800 | |
| MZ0093 #01 Y:2012 | 01 | 2012 | Reduce illumination to minimum necessary levels | $4,525 | $1,520 | |
| MAS023 #07 Y:2012 | 07 | 2012 | Reduce the pressure of compressed air to the minimum required | $596 | - | |
| MAS023 #06 Y:2012 | 06 | 2012 | Recover waste heat from equipment | $1,575 | $3,130 | |
| MAS023 #05 Y:2012 | 05 | 2012 | Use cooling tower or economizer to replace chiller cooling | $3,978 | $3,000 | |
| MAS023 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $3,899 | $9,580 | |
| MAS023 #03 Y:2012 | 03 | 2012 | Utilize higher efficiency lamps and/or ballasts | $5,970 | $8,500 | |
| MAS023 #02 Y:2012 | 02 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,502 | $7,500 | |
| MAS023 #01 Y:2012 | 01 | 2012 | Use / purchase optimum sized compressor | $10,820 | $44,000 | |
| UA0077 #07 Y:2012 | 07 | 2012 | Eliminate or reduce compressed air usage | $6,398 | $58 | |
| UA0077 #06 Y:2012 | 06 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $6,608 | $2,000 | |
| UA0077 #05 Y:2012 | 05 | 2012 | Reduce the pressure of compressed air to the minimum required | $24,553 | $800 | |
| UA0077 #04 Y:2012 | 04 | 2012 | Use optimum thickness insulation | $880 | $913 | |
| UA0077 #03 Y:2012 | 03 | 2012 | Cover open tanks | $4,562 | $154 | |
| UA0077 #02 Y:2012 | 02 | 2012 | Recover waste heat from equipment | $17,282 | $20,463 |