Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

523

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spring and wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0093 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $8,852 $2,800
MZ0093 #01 Y:2012 Reduce illumination to minimum necessary levels $4,525 $1,520
MAS023 #07 Y:2012 Reduce the pressure of compressed air to the minimum required $596 -
MAS023 #06 Y:2012 Recover waste heat from equipment $1,575 $3,130
MAS023 #05 Y:2012 Use cooling tower or economizer to replace chiller cooling $3,978 $3,000
MAS023 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $3,899 $9,580
MAS023 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $5,970 $8,500
MAS023 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $10,502 $7,500
MAS023 #01 Y:2012 Use / purchase optimum sized compressor $10,820 $44,000
UA0077 #07 Y:2012 Eliminate or reduce compressed air usage $6,398 $58
UA0077 #06 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $6,608 $2,000
UA0077 #05 Y:2012 Reduce the pressure of compressed air to the minimum required $24,553 $800
UA0077 #04 Y:2012 Use optimum thickness insulation $880 $913
UA0077 #03 Y:2012 Cover open tanks $4,562 $154
UA0077 #02 Y:2012 Recover waste heat from equipment $17,282 $20,463
UA0077 #01 Y:2012 Reduce combustion air flow to optimum $17,475 $1,000
OK0821 #11 Y:2011 Optimize plant power factor $19,001 $9,750
OK0821 #10 Y:2011 Install / repair insulation on steam lines $2,699 $3,135
OK0821 #09 Y:2011 Replace boiler $21,929 $26,400
OK0821 #08 Y:2011 Reduce the pressure of compressed air to the minimum required $5,301 -