Assessment Year | 2012 |
---|---|
Principal Product | metal springs |
NAICS | 332613: Spring Manufacturing |
SIC | 3495: Wire Springs |
Sales Range | $500 k to 1M |
# of Employees | 120 |
Plant Area |
135,000
ft2
|
Annual Production | 5,500
ton
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $634,052 | 9,861,800 |
kWh
|
$0.064 |
Electricity Demand | $368,264 | 31,524 |
kW-mo/yr
|
$11.68 |
Natural Gas | $41,116 | 6,338 |
MMBtu
|
$6.49 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $50,091 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,966 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.7111: Reduce illumination to minimum necessary levels | $4,525 | $1,520 |
$3,624
56,358
kWh
|
$901
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,852 | $2,800 |
$7,846
122,024
kWh
|
$1,006
-
kW-mo/yr
|
|
03 | 2.7135: Install occupancy sensors | $1,224 | $700 |
$599
9,318
kWh
|
$625
-
kW-mo/yr
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $4,388 | $1,120 |
$3,514
54,658
kWh
|
$874
-
kW-mo/yr
|
|
05 | 2.3212: Optimize plant power factor | $21,600 | $15,000 |
$21,600
335,925
kWh
|
- | |
06 | 2.7221: Lower temperature during the winter season and vice-versa | $9,502 | - |
$9,502
130,169
kWh
|
- | |
TOTAL RECOMMENDED | $50,091 | $21,140 |
$46,685
708,452
kWh
|
$3,406
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $23,966 | $4,620 |
$21,461
316,169
kWh
|
$2,505
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs