ITAC Assessment: UA0077
ITAC logo
ITAC Assessment: UA0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Screen Wire
NAICS 332618: Other Fabricated Wire Product Manufacturing
SIC 3399: Primary Metal Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 1,200
Plant Area 1,437,500
ft2
Annual Production 1,651
ton
Production Hrs. Annual 8,760
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,525,900 40,609,325
kWh
Natural Gas $920,596 191,436
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1113: Reduce combustion air flow to optimum $17,475 $1,000 - $17,475
-
MMBtu
02 2.2437: Recover waste heat from equipment $17,282 $20,463 - $17,282
-
MMBtu
03 2.2514: Cover open tanks $4,562 $154 - $4,562
-
MMBtu
04 2.2515: Use optimum thickness insulation $880 $913 - $880
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $24,553 $800 $24,553
394,553
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,608 $2,000 $6,608
106,231
kWh
-
07 2.4239: Eliminate or reduce compressed air usage $6,398 $58 $6,398
102,856
kWh
-
TOTAL RECOMMENDED $77,758 $25,388 $37,559
603,640
kWh
$40,199
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs