ITAC Assessment: BD0369
ITAC logo
ITAC Assessment: BD0369
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Fabricated Parts for Heavy Equipments
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $5
M
to 10
M
# of Employees 90
Plant Area 180,000
ft2
Annual Production 10,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,505 1,507,265
kWh
Electricity Demand $18,314 7,218
kW-mo/yr
Electricity Fees $17,925 -
Natural Gas $185,346 18,498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $115,202 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $39,238 $55,259 $38,053
476,254
kWh
$1,185
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $28,395 $14,100 $25,758
322,379
kWh
$2,637
-
kW-mo/yr
- - -
03 2.7122: Disconnect ballasts $4,206 $205 $3,950
49,450
kWh
$256
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $567 $400 $373
4,660
kWh
$16
-
kW-mo/yr
$178 - -
05 2.4221: Install compressor air intakes in coolest locations $371 $1,000 $355
4,562
kWh
$16
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $590 $730 $556
6,954
kWh
$34
-
kW-mo/yr
- - -
07 2.7231: Use radiant heater for spot heating $8,016 $6,890 - - - $8,016
-
MMBtu
-
08 2.2414: Use waste heat from hot flue gases to preheat $12,703 $2,500 - - - $12,703
-
MMBtu
-
09 2.7493: Use double or triple glazed windows to maintain higher relative humidity and to reduce heat losses $386 $1,898 - - - $386
-
MMBtu
-
10 3.2123: Convert to high volume low pressure (hvlp) paint guns $20,730 $17,200 - - - - $20,730
-
gal
TOTAL RECOMMENDED $115,202 $100,182 $69,045
864,259
kWh
$4,144
-
kW-mo/yr
$178 $21,105
-
MMBtu
$20,730
-
gal
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs