Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

534

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Spring and wire product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
DL0114 #03 Y:2013 Recover waste heat from equipment $11,278 $2,350
DL0114 #02 Y:2013 Recover waste heat from equipment $12,684 $2,350
DL0114 #01 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $7,410 $2,000
WM0006 #09 Y:2012 Improve space comfort conditioning $6,854 $884
WM0006 #08 Y:2012 Reschedule plant operations or reduce load to avoid peaks $15,810 -
WM0006 #07 Y:2012 Reschedule plant operations or reduce load to avoid peaks $341 -
WM0006 #06 Y:2012 Turn off equipment during breaks, reduce operating time $772 -
WM0006 #05 Y:2012 Maintain air filters by cleaning or replacement $1,994 $191
WM0006 #04 Y:2012 Reschedule plant operations or reduce load to avoid peaks $22,037 -
WM0006 #03 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $8,926 -
WM0006 #02 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $3,581 $488
WM0006 #01 Y:2012 Lower temperature during the winter season and vice-versa $444 -
OK0831 #06 Y:2012 Install set-back timers $661 $650
OK0831 #05 Y:2012 Use waste heat from hot flue gases to preheat $209,307 $450,000
OK0831 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,712 $1,746
OK0831 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $23,398 $52,500
OK0831 #02 Y:2012 Reduce the pressure of compressed air to the minimum required $4,802 -
OK0831 #01 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $5,257 $750
AM0618 #09 Y:2012 Use synthetic lubricant $360 -
AM0618 #08 Y:2012 Reduce the pressure of compressed air to the minimum required $650 $25