ITAC Assessment: OK0831
ITAC logo
ITAC Assessment: OK0831
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Leaf Springs
NAICS 332613: Spring Manufacturing
SIC 3493: Steel Springs, Except Wire
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 200,000
ft2
Annual Production 13,000
ton
Production Hrs. Annual 4,992
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $305,370 5,902,421
kWh
Electricity Demand $134,620 14,959
kW-mo/yr
Natural Gas $532,026 137,092
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $246,137 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,118

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,257 $750 $5,257
105,149
kWh
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,802 - $3,352
67,043
kWh
$1,450
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $23,398 $52,500 $20,914
418,282
kWh
$2,484
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,712 $1,746 $2,712
50,559
kWh
- -
05 2.2414: Use waste heat from hot flue gases to preheat $209,307 $450,000 - - $209,307
-
MMBtu
06 2.6232: Install set-back timers $661 $650 $261
5,217
kWh
- $400
-
MMBtu
TOTAL RECOMMENDED $246,137 $505,646 $32,496
646,250
kWh
$3,934
-
kW-mo/yr
$209,707
-
MMBtu
TOTAL IMPLEMENTED $34,118 $53,900 $29,784
595,691
kWh
$3,934
-
kW-mo/yr
$400
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs