Assessment Year | 2012 |
---|---|
Principal Product | Leaf Springs |
NAICS | 332613: Spring Manufacturing |
SIC | 3493: Steel Springs, Except Wire |
Sales Range | $10 M to 50M |
# of Employees | 170 |
Plant Area |
200,000
ft2
|
Annual Production | 13,000
ton
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $305,370 | 5,902,421 |
kWh
|
$0.052 |
Electricity Demand | $134,620 | 14,959 |
kW-mo/yr
|
$9.00 |
Natural Gas | $532,026 | 137,092 |
MMBtu
|
$3.88 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $246,137 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,118 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,257 | $750 |
$5,257
105,149
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,802 | - |
$3,352
67,043
kWh
|
$1,450
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,398 | $52,500 |
$20,914
418,282
kWh
|
$2,484
-
kW-mo/yr
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,712 | $1,746 |
$2,712
50,559
kWh
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $209,307 | $450,000 | - | - |
$209,307
-
MMBtu
|
|
06 | 2.6232: Install set-back timers | $661 | $650 |
$261
5,217
kWh
|
- |
$400
-
MMBtu
|
|
TOTAL RECOMMENDED | $246,137 | $505,646 |
$32,496
646,250
kWh
|
$3,934
-
kW-mo/yr
|
$209,707
-
MMBtu
|
||
TOTAL IMPLEMENTED | $34,118 | $53,900 |
$29,784
595,691
kWh
|
$3,934
-
kW-mo/yr
|
$400
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs