Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

775

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fabricated structural metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0295 #08 Y:2026 Replace hydraulic / pneumatic equipment with electric equipment $15,103 $291,632
UU0295 #07 Y:2026 Upgrade obsolete equipment $29,987 $230,300
UU0295 #06 Y:2026 Replace old machine with new automatic multi-station tool $67,000 $366,000
UU0295 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $2,215 $2,600
UU0295 #04 Y:2026 Add equipment/ operators to reduce production bottleneck $117,621 $572,000
UU0295 #03 Y:2026 Increase use of automation $104,580 $436,000
UU0295 #02 Y:2026 Increase use of automation $108,218 $717,000
UU0295 #01 Y:2026 Increase use of automation $108,218 $1,740,000
MI0465 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $7,975 $22,686
MI0465 #06 Y:2025 Air condition only space necessary $4,597 $5,600
MI0465 #05 Y:2025 Upgrade controls on compressors $42,932 $22,088
MI0465 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $31,692 $1,185
MI0465 #03 Y:2025 Lower temperature during the winter season and vice-versa $11,875 $210
MI0465 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $14,250 -
MI0465 #01 Y:2025 Turn off equipment during breaks, reduce operating time $3,097 -
AM0962 #09 Y:2025 Use solar heat to make electricty $55,000 $363,450
AM0962 #08 Y:2025 Utilize energy-efficient belts and other improved mechanisms $312 -
AM0962 #07 Y:2025 Use synthetic lubricant $862 $406
AM0962 #06 Y:2025 Install skylights $1,950 $6,536
AM0962 #05 Y:2025 Optimize plant power factor $2,920 $3,290