Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

713

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Fabricated structural metal manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1116 #08 Y:2025 Optimize plant power factor $1,999 $5,700
UD1116 #07 Y:2025 Install compressor air intakes in coolest locations $712 $1,015
UD1116 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $2,166 $5,318
UD1116 #05 Y:2025 Utilize controls to operate equipment only when needed $251 -
UD1116 #04 Y:2025 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,842 $908
UD1116 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,126 $5,813
UD1116 #02 Y:2025 Turn off equipment during breaks, reduce operating time $9,462 $15,035
UD1116 #01 Y:2025 Turn off equipment when not in use $1,791 -
MZ0375 #09 Y:2025 Upgrade obsolete equipment $394,334 $2,410,000
MZ0375 #08 Y:2025 Replace hydraulic / pneumatic equipment with electric equipment $7,435 $12,750
MZ0375 #07 Y:2025 Use solar heat to make electricty $34,746 $214,502
MZ0375 #06 Y:2025 Lower temperature during the winter season and vice-versa $4,865 -
MZ0375 #05 Y:2025 Install occupancy sensors $295 $2,100
MZ0375 #04 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $12,542 $13,100
MZ0375 #03 Y:2025 Use photocell controls $1,090 $1,405
MZ0375 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,208 $400
MZ0375 #01 Y:2025 Recover waste heat from equipment $19,447 $22,100
UW2504 #06 Y:2025 Upgrade obsolete equipment $32,988 $55,500
UW2504 #05 Y:2025 Insulate glazing, walls, ceilings, and roofs $9,594 $149,864
UW2504 #04 Y:2025 Install vinyl strip / high speed / air curtain doors $16,531 $210,600