Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,149

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Forging and stamping
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0339 #06 Y:2005 Develop a repair/replace policy $2,245 $370
WV0339 #05 Y:2005 Use waste heat from hot flue gases to preheat $3,690 $8,160
WV0339 #04 Y:2005 Analyze flue gas for proper air/fuel ratio $3,721 $1,000
WV0339 #03 Y:2005 Insulate bare equipment $3,744 $990
WV0339 #02 Y:2005 Utilize energy-efficient belts and other improved mechanisms $4,951 -
WV0339 #01 Y:2005 Utilize higher efficiency lamps and/or ballasts $6,620 $11,160
TA0114 #06 Y:2005 Utilize higher efficiency lamps and/or ballasts $117 $270
TA0114 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $684 -
TA0114 #04 Y:2005 Eliminate leaks in inert gas and compressed air lines/ valves $2,234 $60
TA0114 #03 Y:2005 Insulate bare equipment $24,225 $1,020
TA0114 #02 Y:2005 Use radiant heater for spot heating $21,785 $14,190
TA0114 #01 Y:2005 Upgrade controls on compressors $66,794 $14,400
WI0512 #07 Y:2005 Install occupancy sensors $258 $150
WI0512 #06 Y:2005 Recharge batteries on during off-peak demand periods $843 $700
WI0512 #05 Y:2005 Install compressor air intakes in coolest locations $3,371 $3,200
WI0512 #04 Y:2005 Automate payroll system $5,350 -
WI0512 #03 Y:2005 Use evaporation to concentrate material $24,691 $12,000
WI0512 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $29,679 $72,610
WI0512 #01 Y:2005 Re-arrange equipment layout to reduce labor costs $554 $21,500
UM0298 #05 Y:2005 Install occupancy sensors $126 $92