ITAC Assessment: WV0339
ITAC logo
ITAC Assessment: WV0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Automotive metal stamping and assemblies
NAICS 332119: Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 130
Plant Area 150,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 2,550
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,539 2,068,275
kWh
Electricity Demand $49,712 7,287
kW-mo/yr
Electricity Fees $325 -
Natural Gas $138,108 15,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,438 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,620 $11,160 $4,690
60,107
kWh
$1,930
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $4,951 - $3,512
44,829
kWh
$1,439
-
kW-mo/yr
- -
03 2.2511: Insulate bare equipment $3,744 $990 - - $3,744
-
MMBtu
-
04 2.1233: Analyze flue gas for proper air/fuel ratio $3,721 $1,000 - - $3,781
-
MMBtu
$(-60.0)
05 2.2414: Use waste heat from hot flue gases to preheat $3,690 $8,160 - - $3,690
-
MMBtu
-
06 2.4151: Develop a repair/replace policy $2,245 $370 $1,931
24,612
kWh
$794
-
kW-mo/yr
- $(-480.0)
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,423 $100 $1,007
12,978
kWh
$416
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $1,363 $925 $961
12,432
kWh
$402
-
kW-mo/yr
- -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,098 $1,270 $824
10,463
kWh
$334
-
kW-mo/yr
- $(-60.0)
10 2.4239: Eliminate or reduce compressed air usage $583 $150 $412
5,278
kWh
$171
-
kW-mo/yr
- -
TOTAL RECOMMENDED $29,438 $24,125 $13,337
170,699
kWh
$5,486
-
kW-mo/yr
$11,215
-
MMBtu
$(-600.0)
TOTAL IMPLEMENTED $20,664 $14,040 $12,376
158,267
kWh
$5,084
-
kW-mo/yr
$3,744
-
MMBtu
$(-540.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs