ITAC Assessment: SF0300
ITAC logo
ITAC Assessment: SF0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Printed Circuit Board Assembly
NAICS 334412: Bare Printed Circuit Board Manufacturing
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 53,715
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $543,594 5,267,600
kWh
Natural Gas $3,304 3,284
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,079 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,189

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $4,565 $273 $4,565
48,266
kWh
-
02 2.4133: Use most efficient type of electric motors $2,670 $949 $2,206
23,304
kWh
$464
-
kW-mo/yr
03 2.8114: Change rate schedules or other changes in utility service $57,647 $31,100 $57,647
-
kWh
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,975 $2,706 $3,349
35,381
kWh
$626
-
kW-mo/yr
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,974 $3,208 $2,486
26,257
kWh
$488
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $545 $855 $441
4,654
kWh
$104
-
kW-mo/yr
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $423 $715 $356
3,784
kWh
$67
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,280 $8,246 $4,280
45,217
kWh
-
TOTAL RECOMMENDED $77,079 $48,052 $75,330
186,863
kWh
$1,749
-
kW-mo/yr
TOTAL IMPLEMENTED $6,189 $5,012 $5,133
54,215
kWh
$1,056
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs